Project Details

The existing structure was a wooden structure in poor condition. Due to heavy rains, the river was higher than anticipated, requiring a contract modification at the beginning of the project to place temporary shoring in place of a turbidity barrier. After abutment construction, the large number of springs from behind the abutment required review and a change in the backfill material used due to these conditions.