Project Details

Stevens provided construction leadership, inspection services and materials sampling for these three bridge replacement projects. These bridge projects included removal of the old structure, construction of a new slab deck bridge, and riprap. Coordination with St. Croix County to perform the grading, paving and restoration.

Due to heavy spring rains, sheeting was substituted for a turbidity barrier on 220th Street Bridge to protect the Willow River. The 130th Avenue Bridge was also closely monitored due to rapidly rising waters after storm events. Stevens provided the project leader for site inspection, concrete testing, and material documentation and review.

Back to Portfolio

More Projects