Andover Community Center & YMCA
Ice Rinks
ICE SYSTEM
Indirect, R-22/Calcium Chloride
Sand Floor
PROJECT COMPLETION
October, 2003
CONSTRUCTION COST
Ice System: $430,000
OWNER
City of Andover, Minnesota
Andover, Minnesota
Project Scope
The Andover Community Center is a great example of an affordable ice system for a community based rink. The ice system includes:
- An industrial grade refrigeration system designed for year round operation providing efficient operation, low maintenance, and high performance. The system will serve the facility for over 25 years.
- Layout that allows easy access to all equipment for safe and easy operation and maintenance.
- A waste heat recovery system that captures “free heat” from the refrigeration system and uses it for melting ice shavings in the snow melt pit and for heating the sub-soils beneath the ice rink floor for frost protection.
- Simple, straight forward controls for the refrigeration systems that are easy to operate while providing necessary monitoring capabilities.
- A sand rink floor with fusion welded polyethylene piping system; a seamless, low maintenance design.